# Legendary Services Co.: Edge Executive Assistants client story

Source: https://edgeexecutiveassistants.com/client-stories/legendary-services-co
Publisher: Edge Executive Assistants (https://edgeexecutiveassistants.com)
Last reviewed: 2026-11-15
Request a Fit Call: https://link.edgevirtualassistants.com/widget/bookings/edge-executive-assistants-book-a-call
Page title on the live site: Legendary Services Co. Client Story | Edge Executive Assistants

Roofing, Exterior & Construction Services · United States

# Legendary Services Co.: Installing a 3-Path Lead Qualification Triage & Pre-Production Material Readiness Gate

- **Owner:** Greg Walton

- **Edge team:** Manuela Rigueiro

- **Progress:** Sprints 1-5 installed: workflows, playbooks, role ownership, scorecards, and meeting rhythm

- **Tools Used:** CRM & Gantt Boards, CompanyCam, QuickBooks, Google Sheets

01 · The "Before" Reality

## Growth Outpacing Manual Processes

As customer inquiries grew across roofing and exterior construction projects, Greg Walton was personally driving out to properties for full on-site walkthroughs and drafting detailed proposals for early-stage callers who only needed a quick ballpark estimate, while also coordinating material delivery timelines against the live crew schedule.

02 · Single Constraint Diagnosis

## Primary Constraint Locked In

Three-Path Sales Triage & Pre-Production Material Verification: routing inbound leads at first phone contact into one of three explicit sales tracks (Raw Quote, On-Site Walkthrough, or Formal Proposal), while verifying material delivery and scope readiness before placing jobs on the active production schedule.

Identify buyer intent and project scope on the initial intake call so callers are routed to the right sales track (Raw Quote, Walkthrough, or Formal Proposal) managed by Manuela Rigueiro, and separate Contract Signed from Scheduled for Production until materials and site access are verified.

03 · What Was Built in the Sprints

## Specificity, Workflows & Playbooks

Re-engineered the Lead Acquisition and Sales Workflow to route every qualified inbound inquiry at first contact into one of three explicit execution tracks: Path A: Raw Quote (fast desk estimate for initial ballpark inquiries), Path B: On-Site Walkthrough (field inspection required), or Path C: Formal Proposal (ready-to-scope project with known specifications), paired with a mandatory Pre-Production Material Readiness Gate.

04 · System Rollout & Team Adoption

## How the Playbooks Locked In Across the Team

Greg and Manuela Rigueiro defined clear qualification criteria (project type, customer photos provided, and scope readiness) at the intake decision point so each prospect enters the right sales path immediately, and paired the Weekly Meeting Rhythm with a daily 15-minute production readiness check so material orders and crew schedules are confirmed 48 hours before mobilization.

05 · Before vs. After Operational Shift

## What changed in the work.

| Operational Dimension | Before Edge | After Edge |
| --- | --- | --- |
| Owner Involvement | Greg personally handled initial site visits, drafted preliminary quotes, and adjusted daily crew schedules when material deliveries shifted. | Manuela qualifies inbound leads, prepares Raw Quotes, books vetted Walkthroughs, and verifies pre-production material readiness. |
| Workflow Execution | Single sales path for all callers; projects placed on the crew calendar before material delivery dates were confirmed. | Explicit 3-Path Sales Workflow (Raw Quote, Walkthrough, Formal Proposal) plus a Pre-Production Material Verification Gate. |
| Visibility & Cadence | Limited visibility into conversion rates by quote type or weekly department KPIs. | Weekly Scorecard tracking conversion across all three sales tracks alongside Production and Administration metrics. |

## Additional Workstreams Shipped

Additional Sprint Workstream 01

### Pre-Production Material & Scope Verification Gate

- **What was built:** Built the Fulfillment and Production Scheduling Playbook and role ownership definitions, establishing a mandatory Material and Scope Verification Gate before any project is placed on the active crew calendar.

- **Before:** Sold projects were previously added directly to the production calendar upon signature before material delivery dates and crew capacity were cross-checked.

- **Diagnosis:** Separate Contract Signed from Scheduled for Production so a project enters the active crew calendar only after the completes the Pre-Production Readiness Playbook (materials ordered, delivery date confirmed, and site access verified).

- **Team adoption:** Manuela paired the Weekly Scorecard Meeting Rhythm with a daily 15-minute production readiness check so material deliveries and crew assignments are verified 48 hours before crews mobilize.

Additional Sprint Workstream 02

### Aligning Sales, Production & Administration in clear role ownership & Weekly Scorecard

- **What was built:** Completed clear role ownership, Department Scorecards, and Weekly Meeting Rhythm for Legendary Services Co., assigning clear single-owner KPIs across Sales, Production, and Administration.

- **Before:** Team members shared overlapping administrative duties and weekly check-ins focused on reactive status updates rather than trend metrics.

- **Diagnosis:** Assign a single owner to every KPI in clear role ownership and review those numbers in a structured weekly leadership agenda.

- **Team adoption:** By assigning one metric owner to every row in clear role ownership and pre-populating the Weekly Scorecard ahead of every leadership meeting, Manuela gave Greg a live weekly pulse across every department.

## Talk to Edge about a full-time Executive Assistant.

Request a Fit Call to see how an Edge EA, with Fractional COO support and systems installed in two-week sprints, can take the day-to-day off your shoulders.

[Request a Fit Call](https://link.edgevirtualassistants.com/widget/bookings/edge-executive-assistants-book-a-call)
